Partners (Transport Manager)

Here you can specify partners to be transferred to the target system. Channels of a partner are also transferred. Note: See also section Guidelines for Creating Profiles in the Test System for Transporting to the Productive System. Note: Changes made in the meantime are not updated in the list. You can force an update to the latest versions using the context menu (Refresh entries).

images/download/attachments/53415397/1369-version-1-modificationdate-1671608565340-api-v2.png


(1) Select a partner here.

(2) If this checkbox is set, local certificates of the partners are transferred as well.

(3) If the source and target partner have the same name, the existing partner on the target system is overwritten if (3) is set to Yes. However, existing channels of the target partner that are not overwritten are not deleted. So you get the union of the channels. Alternatively, you can select only certain channels for transmission in (4) if Only specified is set in (3).

(4) Here you can select channels to be transferred . See also (3).

(5) Click here to create the job.

(6) Click here to execute the job. See also (7).

(7) Alternatively to (6), a schedule can be created via the context menu.